tgss-mem

Geometric Memory Manager — TTI.TOOL.TGSS-MEM-001

Memory #115 CURRENT

Lydian Recap & Continuity (2026-04-30) State-of-stack recap .docx delivered + V3.0 consolidation strategy agreed; Delta finding deferred # Lydian Recap & V3.0 Continuity — 2026-04-30 **Recap delivered:** - File: `D:/GitHub/lydian-node-specs/GCD_BRIEF_LYDIAN-RECAP-001_V1_0.docx` (62 KB, GCD palette / Cambria / Navy-Gold) - Builder (re-runnable): `D:/GitHub/lydian-node-specs/tools/build_lydian_recap_2026_04_30.py` - Structure: 8 sections + 4 appendices, 31 tables — Inventory, V2.4 close-out checklist (Appendix A), Delta peering runbook (Appendix B, with TWO `TO BE RECORDED` placeholders for Mark's deferred finding), TribNet ARCH skeleton (Appendix C — proposed owner Rick Peters), 120-term glossary (Appendix D) - Status: First issue, pending Mark's print and deep-review **V3.0 consolidation strategy (agreed):** Three-lane sequencing with in-place supersession: - **Lane 1 (never blocked):** Diego on V2.4 close, Rick on TribNet ARCH — moves against current repo HEADs - **Lane 2 (Mark + Claude):** Historical baseline freeze (git tags `v2.x-historical-2026-04-30` per repo) → working area `D:/GitHub/lydian-v3-consolidation/` (LOCAL_ONLY, not new repo) → migration map (every V2.x doc → V3.0 destination + status) - **Lane 3 (gated by V2.4 close):** Delta peering, Micro-Node v2 spec, V2.4 close-out brief **Conventions:** major version bump on supersession only; single canonical home per concept (no more aggregated/ duplicates after migration); four-entity structure honoured (TTI/TTF/GCE/GCD); in-place supersession (same repo URLs); V3.0 = production-assurance milestone per umbrella V2.3 §1.5. **Delta finding (2026-04-30):** Mark identified a major issue with the Delta machine; chose to defer the specific finding to the V3.0 consolidation cycle where it will be addressed during version-document staging. Two placeholders in recap Appendix B (§B.1 row, §B.4 last row) await the recording. **Do not press Mark for the specifics** — deferral is intentional. **Why:** Single document gives the dev team a coherent view of where the stack stands and what concrete next deliverables are owner-assigned; consolidation strategy keeps Diego and Rick unblocked while Mark drives V3.0 staging. **How to apply:** When Mark gives the green light, the FIRST consolidation deliverable is Lane 2.1 — historical baseline tags across the active Lydian repos. Tags are immutable, lightweight, fully reversible. Do NOT execute git tag operations without explicit Mark approval (remote-state change). Continuity document at `D:/GitHub/lydian-node-specs/CONTINUITY_2026-04-30.md` has the full repo list and resume instructions. — [project_lydian_recap_2026_04_30.md]

CompositeDC4DFC30043644B77
Project prime13
Domain prime49
Type prime67
Importance0.343295 (ACTIVE)
Decay epoch0
Created2026-05-04 15:46:49
Valid from(unset)
Valid toNULL — still believed true

Outgoing Edges

No outgoing edges.

Link to Another Memory

Back to memories